Unleashed by PETCO – Final Concept Rendering

We went through a lot of iterations of this storefront. Like most of the process, we were designing for both concept approval and the construction crew! Everything I was designing had to be able to be built: and immediately. We had less than 4 months to open the store. Immediately upon approval of a concept piece, I would turn the Vectorworks files into build drawings and send them off to an architect/construction firm for translation into construction plans. And all this was done from Chicago! I hadn’t even seen the storefront in person.

Leave a Reply

Your email address will not be published. Required fields are marked *